the site team shall make sure that areas, where scaffolding erection is taking place, shall be fully isolated and barricaded to prevent the entry of unauthorized personnel. before commencing the erection of any cuplock scaffold, care should be taken to check that the ground is suitable and clear of loose rubble to provide a stable base and clear access for erection. refer to figure 8. fix a diagonal brace to the outer face and end face of the first bay. now it is a simple matter to extend the scaffold structure by connecting ledgers, transoms, and standards to the existing bay checking the alignment of the standards as the scaffold progresses. braces attach to the outward-facing of the cup of the standard.further bracing must be placed on the scaffold as it progresses in length and height.braces should span from lift level to lift level and cross over joints in standards and be positioned all the way to the top of the scaffold.
this bay can either be incorporated within the main run of the scaffold or adjacent to the run. planks can be installed to occupy the gap between the edge of the stair unit at the top landing and the edge of the bay. this bay can either be incorporated within the main run of the scaffold or adjacent to the run. a bay is typical “the enclosed spaced between four standards” and this space extends from the ground to the top working platform for the full height of the scaffold. the scaffolding components to which the ties are attached must also be checked for additional loads.
2.3 scaffolder supervisor or his designee shall inspect all components for defects as the erection proceeds. 5.1.2 scaffolding shall be erected on the request for erection from the contractor and shall be kept in place for the entire duration of required works and shall be dismantled after request for dismantle from the contractor. 5.3.5 scaffold material shall be inspected before, during and after erection by the scaffold supervisor to ensure that they meet the site requirements, are in good condition, and are free of defects. 5.4.3 operatives shall stand under the shade of scaffold and during lifting and lowering their body parts or body trunk shall be under the shade.
the load should not be jerked or snatched as this can make it harder to keep control and can increase the risk of injury. during the entire time that a scaffold is being erected, altered, repaired, or dismantled, a red (“do not use”) scaffold tag shall be continuously attached to the scaffold at each point of access. if the scaffold is safe for use, newly signed green or yellow scaffold tags (as applicable) shall be securely attached to the scaffold prior to re-use. 5.7.2 the scaffold supervisor shall ensure that dismantling of scaffold is planned, orderly, and performed level by level in a proper sequence.
this method statement for scaffolding installation defines the sequence and describes the hse & quality control procedures to be followed scaffolding shall be erected on the request for erection from the contractor and shall be kept in place for the entire duration of required works and task activity – erection of scaffold break the job down into steps base out scaffold • prevent unauthorised access to scaffold area. and erect base lift • one, free scaffolding method statement template, free scaffolding method statement template, method statement for scaffolding pdf, erecting scaffolding procedures, method statement of scaffolding work.
this method statement will be explained and issued to all employees and signed for. the following method statement is written to provide a safe and efficient system of work for the installation of general working scaffold to all areas of a mobile scaffold is effectively a tower scaffold supported on castors. as such the erection procedure applicable to tower scaffold is to be observed. the only, scaffolding procedure, scaffolders method statement, dismantling scaffolding procedures, scaffolding for dummies, scaffolding safety procedures, jsa scaffolding dismantling, aluminium scaffolding installation method statement, scaffolding risk assessment, securing scaffolding to building, scaffolding rams.
When you try to get related information on scaffolding method statement example, you may look for related areas. free scaffolding method statement template, method statement for scaffolding pdf, erecting scaffolding procedures, method statement of scaffolding work, scaffolding procedure, scaffolders method statement, dismantling scaffolding procedures, scaffolding for dummies, scaffolding safety procedures, jsa scaffolding dismantling, aluminium scaffolding installation method statement, scaffolding risk assessment, securing scaffolding to building, scaffolding rams.